Страницы

Thursday, December 29, 2016

Navy

BIW Restart Destroyer Rafael Peralta Completes Acceptance Trials


USS Rafael Peralta (DDG-115) General Dynamics PhotoRafael Peralta is equipped with the Aegis Baseline 9 Combat System which includes an Integrated Air and Missile Defense (IAMD) capability incorporating Ballistic Missile Defense 5.0 Capability Upgrade and Naval Integrated Fire Control-Counter Air capability. The ship’s IAMD radar will provide increased computing power and radar upgrades that improve detection and reaction capabilities against modern air warfare threats. The Aegis Combat System will enable the ship to link radars with other ships and aircraft to provide a composite picture of the battlespace and effectively increase the theater space.
Following delivery, DDG 115 will be the 65th Arleigh Burke class destroyer and the first of the DDG 51 FLT IIA restart ships to be built at Bath Iron Works. The shipyard is currently in production on future destroyers Thomas Hudner (DDG 116), Daniel Inouye (DDG 118) and Carl M. Levin (DDG 120) and under contract for three additional ships awarded as part of the five-ship multi-year procurement for FY13-17.

No comments:

Post a Comment